Address: Terry St Rozelle
100 yr old heritage house had a complete transformation with additional 3 bedrooms and 2 bathrooms at the rear of the property.
Start to finish took us 22 weeks

Address: Willowie Road Castle Cove Extensive excavation to “bring the garages to the ground level” and thus the owners no longer need to share their

Address: Yuruga Ave Caringbah South Design and construction of a duplex with two different layouts at a corner block location. Construction stage lasted 10 months for

Address: Alfred Street Milsons Point We conducted commercial fit-out for multiple levels of this office building. Each level has been completed at different standards based
At MNA Construction we focus on delivering the perfect balance of design and function with a level of outstanding service that is only outmatched by the quality of our work.